AHP’ye Dayalı Bulanık Utastar Yaklaşımı: Malzeme Taşıma Ekipmanı Uygulaması
Göster/ Aç
Tarih
2019-06-25Yazar
Dur , Zeynep
Ambargo Süresi
Acik erisimÜst veri
Tüm öğe kaydını gösterÖzet
Material handling system is a system which transfer material from one location to another
location or store material in a storage. Correct quantity, right time and minimum cost are
the main aim of the material handling system. Material handling equipment is a major
part in material handling system. If designing the whole material handling system is the
main problem, then choosing the right equipment is one of the biggest sub problems.
Companies pay special attention to choose material handling equipment and aim to select
material handling equipment which is proper with processes. Choosing the appropriate
material handling equipment positively affects the efficiency of handling the materials in
production facilities. Delays in production, high lead times, defects and high production
costs might be associated with unsuitable material handling systems.
In this study, a project-based company’s material handling system revaluated and selected
material handling equipment. According to company’s need and requests, mobile crane
is used as material handling equipment.
Many of the approaches to equipment selection problem focuses on multi criteria decision
making methods, knowledge-based systems or analytic methods or the combination of
these approaches. This study applies scoring type (AHP) method and a utility additive
type (UTASTAR) method to crane selection problem for a project-based firm. Potential alternatives and the criteria are determined using decision maker’s opinions and
preferences are obtained. Fuzzy logic is also added to methods.